The concept
The expected average result for operation estimated by the sample and costs.
A worked example
40% average wins +3R and 60% average losses −1R: average +0,6R before costs.
The important limitation
A historical estimate may be uncertain and change out of sample.
How can it win 40% and still make money?
Expectancy = win probability × average win − loss probability × average loss − costs.
Evaluate the strategy on a sample in R, not from win rate alone.
40% wins at +2R and 60% losses at -1R, before costs.
Check your reasoning
40% average wins +3R and 60% average losses −1R: average +0,6R before costs.
Show the explanation
The expected average result for operation estimated by the sample and costs.
A historical estimate may be uncertain and change out of sample.